Contingency Planning And Simulation Exercise: How We Deal With Heat Strock

  132
Issuing time:2020-06-14 16:24

Jiangsu Glory Chemical take a simulation exercise on June 14th, 2020. During the activity, we perform the whole condingency plan about dealing with heat strock.


Heat Strock, the most serious form of heat injury, is a prone disease in Summer months.The staff who prolonged work in an environment over 30 ℃   will cause the increasing of body temperature and is possible to suffer from the accident. We should take our responsibility and pay supreme attention to staff's safety and health. In this case, the simulation training is of immense significance.


What should we do in first aid?

- Call 120 or transport the person to a hospital.

- While waiting for the paramedics to arrive, initiate first aid.

- Move the person to a cool and shady place and remove any unnecessary clothes.

- Using fan or cool water to low down body temperature.


Home         About            Produrt            Applicotion          Contact
咨詢服務
 
 
website qrcode

歡迎掃碼關注我們

 Contact Details
客服熱線:18506275062
郵箱:abc@qq.com